FttH project Haaksbergen

FttH project Haaksbergen

Create a fibreoptic network with 8,600 connections within 1 year.
Construction of the fibreoptic network started in 2008 and was completed in October 2009. Fiber4All’s approach was characterised by thinking from the inside out. This means that the work is prepared in such a way that the end-users of the fibreoptic link (residents) only need to be asked to accommodate the connection process once.

info@fiber4all.eu - T 0341 437 373