FttH project Almere
FttH project Almere
Create a fibreoptic network with 64,000 connections within 3 years.
Construction of the fibreoptic network started in 2007 and was completed in 2010. A large-scale project with thorough preparation, a great deal of capacity and a tight timetable. A total of 64,000 homes were connected.
