Projects

FttH project Haaksbergen

Create a fibreoptic network with 8,600 connections within 1 year.
Construction of the fibreoptic network started in 2008 and was completed in October 2009. Fiber4All’s approach was characterised by thinking from the inside out. This means that the work is prepared in such a way that the end-users of the fibreoptic link (residents) only need to be asked to accommodate the connection process once.

Lees meer

FttH project Almere

Create a fibreoptic network with 64,000 connections within 3 years.
Construction of the fibreoptic network started in 2007 and was completed in 2010. A large-scale project with thorough preparation, a great deal of capacity and a tight timetable. A total of 64,000 homes were connected.

Lees meer

FttH project Leeuwarden

Create a fibreoptic network with 32,000 connections within 2 years.
We started the preparations for this project at the end of 2009 and excavation work started in March 2010. In the first quarter of 2012 we will complete all work according to timetable. A project office has been opened in Leeuwarden from where the day-to-day management takes place.

Lees meer

FttH project Winterswijk

In the space of 10 months Fiber4all connected over 10,000 homes to a fibreoptic network.

Lees meer